Well i have not been very active on the forum latly, but here is a few pictures, and progress so far.
The engine have been pulled out to sort out the oil leaks, by doing this we found a few mistakes made by last owner that needed to be curected, nothing serius, most of it was due to wrong oilfeeds to turbo and a few other bits.
The engine out, ready to be cleaned up a little, only the top have been rebuild.
Other then the small mishaps the progress is slow, by any standards, my mecanik have been home sick, so not much progress.
The new albow from unoturbodk did not fit "out of the box" there was no clearence to the cooling on the alternator, but i belive we get rid of the cooling assembly, and it will fit no problem. This will give it 2,5" all the way from turbo to the end pipe.
Also got a new radiator
brembo sport discs in the front, standard dics in the rear
electronic boost controller: Gizzmo MS-IBC
Johnson G-Maxx suspension:
I was really hoping i gould get the car to MOT just about now, 1st of june, but it will be another 2-3 weeks i think
The icing on the cake must be the first half payment on new Eibach Antirollbar, we have on a groupbuy on facebook, but it will be about 12 weeks before deliver, but thats ok, by then my car should be running