Thread: Today's Data job at Manchester united new office

  1. #11
    Fred Elliot, i say Fred Elliot! Mawbster's Avatar
    Join Date
    Jan 2004
    Location
    Goole/Scunny
    Posts
    9,228
    I can run cables through doorways pretty easy :-)

  2. #12
    Punto know it all
    Join Date
    Aug 2010
    Location
    west Essex
    Posts
    4,154
    Its not a hard job to do every thing is ready to lay your cable down under the floor tiles,
    Its basicly running lengths/bunches of cat6/cat5e utp cable to every desk/floor-box or wall socket terminating the module side then the patch panels in the comms room.
    The communications cabinets can be the hardest of them all due to the overall presentation,
    All honesty its no harder than running a patch lead from your modem/router to your pc or laptop.
    Last edited by B3NZARMY; 22nd July 2011 at 20:06.

  3. #13
    Banned
    Join Date
    Jan 2006
    Location
    Staines
    Posts
    4,945
    Quote Originally Posted by crabbo_1 View Post
    Running network cables in all those bloody hard to get to places inside walls, under carpets, through doorways etc...basically the stuff that most network technicians either haven't got the common sense to be able to do without destroying the building, or just generally can't be fagged to do.

    not having common sense... false being arsed to do it TRUE! that's what outsourced company's are for to fit wires through buildings, network engineers are paid way to much money and have 1000'n 1 other things to do.

  4. #14
    Banned
    Join Date
    Jan 2006
    Location
    Staines
    Posts
    4,945
    Quote Originally Posted by seaneyb View Post
    not having common sense... false being arsed to do it TRUE! that's what outsourced company's are for to fit wires through buildings, network engineers are paid way to much money and have 1000'n 1 other things to do.

    Quote Originally Posted by B3NZARMY View Post
    Its not a hard job to do every thing is ready to lay your cable down under the floor tiles,
    Its basicly running lengths/bunches of cat6/cat5e utp cable to every desk/floor-box or wall socket terminating the module side then the patch panels in the comms room.
    The communications cabinets can be the hardest of them all due to the overall presentation,
    All honesty its no harder than running a patch lead from your modem/router to your pc or laptop.

    its not hard at all piece of piss! the hard work is done by network designers who specifically map locations of servers/switches/routers etc... as regular cat5/6 cable can only be stretched to a max 100m hense the need for fibre

    bet its a longggg job sometimes init ben?

  5. #15
    Punto know it all
    Join Date
    Aug 2010
    Location
    west Essex
    Posts
    4,154

    Thumbs up

    Quote Originally Posted by seaneyb View Post
    its not hard at all piece of piss! the hard work is done by network designers who specifically map locations of servers/switches/routers etc... as regular cat5/6 cable can only be stretched to a max 100m hense the need for fibre

    bet its a longggg job sometimes init ben?
    its very true what your saying there about 100 metres we only use a max of 70-80 never over if the run was longer we would install another cabinet
    it can take weeks in certain offices even months due to the fitment routine

  6. #16
    Banned
    Join Date
    Jan 2006
    Location
    Staines
    Posts
    4,945
    typically 80 metres from switch to a patch panel yes, therefore leaves you about 20m to wire a panel on a desk etc...

  7. #17
    Punto know it all
    Join Date
    Aug 2010
    Location
    west Essex
    Posts
    4,154
    Quote Originally Posted by seaneyb View Post
    typically 80 metres from switch to a patch panel yes, therefore leaves you about 20m to wire a panel on a desk etc...
    yep loads of scrap money you no the way to do it lol

Page 2 of 2 FirstFirst 12

Similar Threads

  1. worse job today!!
    By jonny_gt3 in forum Punto Chat
    Replies: 41
    Last Post: 13th October 2008, 02:26
  2. Today's job
    By puta madra gt in forum Punto Images
    Replies: 8
    Last Post: 29th June 2008, 22:39
  3. United Colours
    By xploitGT in forum Punto Chat
    Replies: 6
    Last Post: 2nd October 2007, 17:37
  4. Midlands United cruise
    By marky_sr in forum Past Events
    Replies: 3
    Last Post: 21st February 2007, 15:12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •